Nicholson's Midwest Team Completes Work for Indiana's 3PORT Tunnel Project
ϳԹ’s Midwest team recently completed work at the Three Rivers Protection and Overflow Reduction Tunnel (3PORT) project in Fort Wayne, IN.
The 3PORT project is part of the city’s Tunnel Works Program, an initiative that involves the construction of a tunnel system to collect overflow waters and transport them to a wastewater treatment plant.
The overall project includes the construction of a deep rock tunnel, drop shafts and consolidation sewers to collect and convey overflow from eight locations along the St. Mary and Maumee Rivers. ϳԹwas contracted by F.A. Wilhelm Construction Co., Inc.to design and install a temporary support of excavation (SOE) for connection between the existing gate structure and the retrieval shaft.
“We have a long history of working on CSO projects across the country,” said Dan Thome, P.E., Senior Vice President, Nicholson’s Midwest Region. “This project is going to make the roads safer and the water cleaner for the people of Fort Wayne, and we’re happyto play a small part in making that happen.”
When completed,3PORT will reduce sewer overflows to Fort Wayne’s rivers by 90% and relieve streetcflooding during major rainstorms.
Nicholson’s portion of the work for this project wrapped up in August.
ϳԹ’s Midwest team recently completed work at the Three Rivers Protection and Overflow Reduction Tunnel (3PORT) project in Fort Wayne, IN.
The 3PORT project is part of the city’s Tunnel Works Program, an initiative that involves the construction of a tunnel system to collect overflow waters and transport them to a wastewater treatment plant.
The overall project includes the construction of a deep rock tunnel, drop shafts and consolidation sewers to collect and convey overflow from eight locations along the St. Mary and Maumee Rivers. ϳԹwas contracted by F.A. Wilhelm Construction Co., Inc.to design and install a temporary support of excavation (SOE) for connection between the existing gate structure and the retrieval shaft.
“We have a long history of working on CSO projects across the country,” said Dan Thome, P.E., Senior Vice President, Nicholson’s Midwest Region. “This project is going to make the roads safer and the water cleaner for the people of Fort Wayne, and we’re happyto play a small part in making that happen.”
When completed,3PORT will reduce sewer overflows to Fort Wayne’s rivers by 90% and relieve streetcflooding during major rainstorms.
Nicholson’s portion of the work for this project wrapped up in August.
About ϳԹ
ϳԹhas been both a leader and an innovator in the geotechnical construction industry for more than 60 years. With regional offices across the country and headquarters located in Pittsburgh, ϳԹis a nationally renowned specialty contractor, offering proven expertise in the design and installation of deep foundation elements, earth retention systems and ground treatment solutions. We pride ourselves on our ability to consistently provide our clients with innovative, high-quality design-build options for projects of varying size and complexity. ϳԹis the North American subsidiary of Soletanche Bachy, one of the world’s leading geotechnical contractors, and is part of a global network of unparalleled geotechnical resources and expertise.
The Drill Down.
Sign up to receive our quarterly newsletter and drill down on some of our most interesting projects.